Full-Service Furnishing
From empty to ready, without you managing a single delivery.

Who it is for
You have a finished, empty home, condo, or small hotel. You want to move in or open once, with everything in place.

What is included
- Furniture
- Lighting and decorative fixtures
- Rugs, curtains, and textiles
- Art and decor
- Appliances and accessories where appropriate
- Sourcing and procurement
- Delivery and installation
- Final styling
How a furnishing project works
Typical time from signed proposal to handover. Made-to-order lead times set most of that.
Discovery call
We talk about your space, your brief, and your budget.
Free, 30 minutes
Site visit and proposal
We measure the space and send a fixed design fee and a budget range.
Design
You see layouts, materials, and a full furnishing plan.
Two revision rounds
Procurement
We order every piece and manage the makers.
Made-to-order lead times usually run 4 to 12 weeks
Installation and styling
Our crew delivers, installs, and styles each room.
Usually within one week on site
Handover
A walkthrough, a care guide, and a visit 30 days later.
How fees work
Design fee included.
The design fee is fixed and quoted per project, based on floor area and scope. The furnishing budget is separate. You pay listed prices for the pieces, and we add no hidden markup on shop items.
Design fee
Furnishing budget
Recent projects
View projectsWhat we do not do
- No construction, renovation, or demolition
- No built-in cabinetry, plumbing, or electrical work
- No architectural design
We start once the space is built. This keeps our attention on what you live with every day: the furniture, the light, and the feel of the room.
Questions we are often asked
How much does it cost?
Furnishing projects start at ₱500,000, including the design fee. The design fee is fixed and quoted per project, based on floor area and scope. The furnishing budget is separate. You pay listed prices for the pieces, and we add no hidden markup on shop items.
How long does a project take?
Most projects take 12 to 20 weeks from signed proposal to handover. Made-to-order lead times set most of that time. Installation usually takes about one week on site.
How do payments work?
You pay 50 percent of the design fee when you sign and 50 percent when you approve the design. You pay 70 percent of the furnishing budget before we order and 30 percent before installation.
Do you work outside Metro Manila?
Yes. We work anywhere in the Philippines. Outside Metro Manila and Calabarzon, the proposal states travel and freight costs.
Can you renovate or build cabinets?
No. We do not build, renovate, or install cabinetry, plumbing, or wiring. The space should be finished before we start.
How many changes can I ask for?
The design stage includes two revision rounds. We settle the layout, materials, and furnishing plan with you before we order anything.

Tell us about your space.
Bring the rooms you have and the life you want in them. We'll do the rest, starting with a free 30-minute call.
Full-Service Furnishing
From empty to ready, without you managing a single delivery.

Who it is for
You have a finished, empty home, condo, or small hotel. You want to move in or open once, with everything in place.
What is included

- Furniture
- Lighting and decorative fixtures
- Rugs, curtains, and textiles
- Art and decor
- Appliances and accessories where appropriate
- Sourcing and procurement
- Delivery and installation
- Final styling
How a furnishing project works
Typical time from signed proposal to handover. Made-to-order lead times set most of that.
Discovery call
We talk about your space, your brief, and your budget.
Free, 30 minutes
Site visit and proposal
We measure the space and send a fixed design fee and a budget range.
Design
You see layouts, materials, and a full furnishing plan.
Two revision rounds
Procurement
We order every piece and manage the makers.
Made-to-order lead times usually run 4 to 12 weeks
Installation and styling
Our crew delivers, installs, and styles each room.
Usually within one week on site
Handover
A walkthrough, a care guide, and a visit 30 days later.
How fees work
Design fee included.
The design fee is fixed and quoted per project, based on floor area and scope. The furnishing budget is separate. You pay listed prices for the pieces, and we add no hidden markup on shop items.
Design fee
Furnishing budget
Recent projects
View projectsWhat we do not do
- No construction, renovation, or demolition
- No built-in cabinetry, plumbing, or electrical work
- No architectural design
We start once the space is built. This keeps our attention on what you live with every day: the furniture, the light, and the feel of the room.
Questions we are often asked
How much does it cost?
Furnishing projects start at ₱500,000, including the design fee. The design fee is fixed and quoted per project, based on floor area and scope. The furnishing budget is separate. You pay listed prices for the pieces, and we add no hidden markup on shop items.
How long does a project take?
Most projects take 12 to 20 weeks from signed proposal to handover. Made-to-order lead times set most of that time. Installation usually takes about one week on site.
How do payments work?
You pay 50 percent of the design fee when you sign and 50 percent when you approve the design. You pay 70 percent of the furnishing budget before we order and 30 percent before installation.
Do you work outside Metro Manila?
Yes. We work anywhere in the Philippines. Outside Metro Manila and Calabarzon, the proposal states travel and freight costs.
Can you renovate or build cabinets?
No. We do not build, renovate, or install cabinetry, plumbing, or wiring. The space should be finished before we start.
How many changes can I ask for?
The design stage includes two revision rounds. We settle the layout, materials, and furnishing plan with you before we order anything.

Tell us about your space.
Bring the rooms you have and the life you want in them. We'll do the rest, starting with a free 30-minute call.



