Full-Service Furnishing

From empty to ready, without you managing a single delivery.

Lilim House living room in shaded daylight: a low sofa, a stone table and wide openings to the greenery

Who it is for

You have a finished, empty home, condo, or small hotel. You want to move in or open once, with everything in place.

Tanaw Residence dressing corner: a sheer linen curtain, a floor mirror and a wood chair in soft daylight

What is included

  • Furniture
  • Lighting and decorative fixtures
  • Rugs, curtains, and textiles
  • Art and decor
  • Appliances and accessories where appropriate
  • Sourcing and procurement
  • Delivery and installation
  • Final styling

How a furnishing project works

12 to 20 weeks

Typical time from signed proposal to handover. Made-to-order lead times set most of that.

  1. Discovery call

    We talk about your space, your brief, and your budget.

    Free, 30 minutes

  2. Site visit and proposal

    We measure the space and send a fixed design fee and a budget range.

  3. Design

    You see layouts, materials, and a full furnishing plan.

    Two revision rounds

  4. Procurement

    We order every piece and manage the makers.

    Made-to-order lead times usually run 4 to 12 weeks

  5. Installation and styling

    Our crew delivers, installs, and styles each room.

    Usually within one week on site

  6. Handover

    A walkthrough, a care guide, and a visit 30 days later.

How fees work

From₱500,000

Design fee included.

The design fee is fixed and quoted per project, based on floor area and scope. The furnishing budget is separate. You pay listed prices for the pieces, and we add no hidden markup on shop items.

Design fee

50 percent
on signing
50 percent
at design approval

Furnishing budget

70 percent
before procurement
30 percent
before installation

Recent projects

View projects

What we do not do

  • No construction, renovation, or demolition
  • No built-in cabinetry, plumbing, or electrical work
  • No architectural design

We start once the space is built. This keeps our attention on what you live with every day: the furniture, the light, and the feel of the room.

Questions we are often asked

How much does it cost?

Furnishing projects start at ₱500,000, including the design fee. The design fee is fixed and quoted per project, based on floor area and scope. The furnishing budget is separate. You pay listed prices for the pieces, and we add no hidden markup on shop items.

How long does a project take?

Most projects take 12 to 20 weeks from signed proposal to handover. Made-to-order lead times set most of that time. Installation usually takes about one week on site.

How do payments work?

You pay 50 percent of the design fee when you sign and 50 percent when you approve the design. You pay 70 percent of the furnishing budget before we order and 30 percent before installation.

Do you work outside Metro Manila?

Yes. We work anywhere in the Philippines. Outside Metro Manila and Calabarzon, the proposal states travel and freight costs.

Can you renovate or build cabinets?

No. We do not build, renovate, or install cabinetry, plumbing, or wiring. The space should be finished before we start.

How many changes can I ask for?

The design stage includes two revision rounds. We settle the layout, materials, and furnishing plan with you before we order anything.

Lilim House at dusk, warm lamps lit inside and the garden in front

Tell us about your space.

Bring the rooms you have and the life you want in them. We'll do the rest, starting with a free 30-minute call.

Full-Service Furnishing

From empty to ready, without you managing a single delivery.

Lilim House living room in shaded daylight: a low sofa, a stone table and wide openings to the greenery

Who it is for

You have a finished, empty home, condo, or small hotel. You want to move in or open once, with everything in place.

What is included

Tanaw Residence dressing corner: a sheer linen curtain, a floor mirror and a wood chair in soft daylight
  • Furniture
  • Lighting and decorative fixtures
  • Rugs, curtains, and textiles
  • Art and decor
  • Appliances and accessories where appropriate
  • Sourcing and procurement
  • Delivery and installation
  • Final styling

How a furnishing project works

12 to 20 weeks

Typical time from signed proposal to handover. Made-to-order lead times set most of that.

  1. Discovery call

    We talk about your space, your brief, and your budget.

    Free, 30 minutes

  2. Site visit and proposal

    We measure the space and send a fixed design fee and a budget range.

  3. Design

    You see layouts, materials, and a full furnishing plan.

    Two revision rounds

  4. Procurement

    We order every piece and manage the makers.

    Made-to-order lead times usually run 4 to 12 weeks

  5. Installation and styling

    Our crew delivers, installs, and styles each room.

    Usually within one week on site

  6. Handover

    A walkthrough, a care guide, and a visit 30 days later.

How fees work

From₱500,000

Design fee included.

The design fee is fixed and quoted per project, based on floor area and scope. The furnishing budget is separate. You pay listed prices for the pieces, and we add no hidden markup on shop items.

Design fee

50 percent
on signing
50 percent
at design approval

Furnishing budget

70 percent
before procurement
30 percent
before installation

Recent projects

View projects

What we do not do

  • No construction, renovation, or demolition
  • No built-in cabinetry, plumbing, or electrical work
  • No architectural design

We start once the space is built. This keeps our attention on what you live with every day: the furniture, the light, and the feel of the room.

Questions we are often asked

How much does it cost?

Furnishing projects start at ₱500,000, including the design fee. The design fee is fixed and quoted per project, based on floor area and scope. The furnishing budget is separate. You pay listed prices for the pieces, and we add no hidden markup on shop items.

How long does a project take?

Most projects take 12 to 20 weeks from signed proposal to handover. Made-to-order lead times set most of that time. Installation usually takes about one week on site.

How do payments work?

You pay 50 percent of the design fee when you sign and 50 percent when you approve the design. You pay 70 percent of the furnishing budget before we order and 30 percent before installation.

Do you work outside Metro Manila?

Yes. We work anywhere in the Philippines. Outside Metro Manila and Calabarzon, the proposal states travel and freight costs.

Can you renovate or build cabinets?

No. We do not build, renovate, or install cabinetry, plumbing, or wiring. The space should be finished before we start.

How many changes can I ask for?

The design stage includes two revision rounds. We settle the layout, materials, and furnishing plan with you before we order anything.

Lilim House at dusk, warm lamps lit inside and the garden in front

Tell us about your space.

Bring the rooms you have and the life you want in them. We'll do the rest, starting with a free 30-minute call.